TECHNICIANS INSTEAD OF 12% OF THE WORK PROVIDED
YES "satisfied" OF' 400% increase
Here the proof, that the Mayor Trebisacce
manage the economy at will.
MONDAY 'October 13, 2010
Protocol No. 1137
Mr. Mayor Al
the Head of Technical
The Ministry for the Environment, Land and
Via Mare
C. Colombo, 44 \u200b\u200b00154 ROMA
Basin Authority of the Calabria Region Regional
Via Crispi, 33 88100 Catanzaro
Through the Public Prosecutor's Office Police Station Oriolo
The Court of Auditors
88100 CATANZARO
The City of Nocara, Decree of the Ministry of DEC/DDS/2008/0912 Address No. 27 November 2008, has received funding of € 250,000.00 for the completion of consolidation of the town in areas with high landslide risk (R3), falls within the Programme of actions to protect the environment and soil conservation in the region of Calabria. "
E 'clear indications that the current administration, and then the design choices made on the completion of these works in the consolidation phase of the contract, they should take account of geomorphological studies and design choices done and done in the recent past by the previous administration, to which, among other things of that financing.
In principle, in fact, completion of an intervention is not possible without a proper analysis of what has been achieved, especially if the project completion, as indicated by the title of the project is to supplement what already exists.
A simple reading of the design and related accounting documents, it is clear that the work be carried out, as it's set, are not sufficient to complete the intervention, a definitive and convincing, but highlight only a waste of money public without solve the problems remained suspended in the previous intervention.
Such waste is contained in the fare provided in technical project for the total sum of € 70,000.00, representing 44% of the amount of work-based auction. Given the projects planned and executed the design level, these costs should be kept within 12% of planned work and then by the maximum sum of € 19,239.00, with the creation of an economy of € 50,000.00
use for further work.
The second observation is a technical, as the work to create a curtain of microprobes to run on top of the hill, just off Via Polmo, the amount total of € 90,000.00, downstream slope already established with the previous intervention, through the implementation of micro-piles. A good rule of art teaches us, however, that the slopes are consolidated in the valley, in order to prevent sliding of the same. A Nocara, strangely, the slopes, against every principle of physics, they are consolidated upstream (ahead), where among other things, as shown by photographic documentation attached to the project, the affected area shows no signs of slowing , cracking and / or anything else that could lead to preventive measures for the mitigation of landslide risk.
In the photos attached to the project, can be seen only minimal damage to the pavement failure porphyry and we find no injury on the road is perfectly level, there are no signs of failure in existing buildings. The cordoletto of concrete to be demolished, is also there on the road for over fifty years and is perfectly intact, with no signs of injury and failure.
E 'serious enforcement specialists to analyze a problem of this type confuse superficial injuries, which affect only the pavement of porphyry, with serious injuries and failure to justify actions "unnecessary" by Consolidation with microprobes for an amount of € 90,000, 00. And 'the more serious when he approved a bill much higher than that due increased by about 400% compared to the amount due.
The same consideration can be made for speech to integrative Porta Via Capuana, with tottering on an area (land previously donated to the city by the heirs of John Rubottom), through the implementation of a concrete wall upstream another existing, with a clear charge that not only brings benefits to the area to be consolidated but, indeed, could undermine the stability of the zone. Upstream and then just below the existing buildings, and downstream of the same wall, there are others like that in that form of terraces and are certainly more dilapidated than that which is expected rebuilding, so much so that the wall just upstream, in recent times, has suffered landslides and collapses.
In fact this intervention, as designed, it seems to be executed for the sole purpose of creating a plot reserved for the parking lot of community leaders and service to the occupants of nearby houses.
As on 15.12.2010 is expected to tender for the procurement of these works, the city government and invite it to the Tech city to suspend the tender for the award of work and reformulate the project considering the objections put forward in order to use public money in a profitable way to solve problems and not create others. Some
that the municipal authorities should take account of findings, it Best regards.
Nocara 13/12/2010